Record

The engineering record.

Three engineering cases and the same method applied to the power grid I grew up on.

Manufacturing ramp

Scale the output the customer can use.

800 → 2,000
Decision
Increase finished mixer-bag output during the COVID demand surge.
My role
I led the team that increased output. We used completed bags as the measure of capacity.
Result
Monthly output rose from about 800 to 2,000 finished bags.
Read the manufacturing case

Process validation

A passed sample can leave the process unproven.

33 of 33
Decision
Determine what a completed pressure-test series could support in a manufacturing sign-off.
My role
I reviewed the test record against the process settings the qualification was meant to establish.
Result
All 33 sampled bags passed pressure testing. The record did not capture the settings used to make them, leaving the operating window unverified by that run.
Read the validation case and measured thermal traces

Atlas · Internal system at my employer

Put past experiments back to work.

1 internal system
Decision
Make engineering evidence easier to reuse in day-to-day R&D decisions.
My role
I conceived and built Atlas, then brought it to the engineers who use it.
Result
Atlas retrieves past tests and drafts cited assessments for a person to review.

Independent research · U.S. Virgin Islands

The Power Record.

I grew up on St. Thomas. I track outages, available generation and project milestones to see which investment actually improves electric service on St. Thomas and St. John.

Open The Power Record