Skip to content
Record
The engineering record.
Three engineering cases and the same method applied to the power grid I grew up on.
Manufacturing ramp
Scale the output the customer can use.
800 → 2,000
- Decision
- Increase finished mixer-bag output during the COVID demand surge.
- My role
- I led the team that increased output. We used completed bags as the measure of capacity.
- Result
- Monthly output rose from about 800 to 2,000 finished bags.
Process validation
A passed sample can leave the process unproven.
33 of 33
- Decision
- Determine what a completed pressure-test series could support in a manufacturing sign-off.
- My role
- I reviewed the test record against the process settings the qualification was meant to establish.
- Result
- All 33 sampled bags passed pressure testing. The record did not capture the settings used to make them, leaving the operating window unverified by that run.
Atlas · Internal system at my employer
Put past experiments back to work.
1 internal system
- Decision
- Make engineering evidence easier to reuse in day-to-day R&D decisions.
- My role
- I conceived and built Atlas, then brought it to the engineers who use it.
- Result
- Atlas retrieves past tests and drafts cited assessments for a person to review.
Independent research · U.S. Virgin Islands
The Power Record.
I grew up on St. Thomas. I track outages, available generation and project milestones to see which investment actually improves electric service on St. Thomas and St. John.
Open The Power Record